A/E/C/FM Integration [C]Construction Research Congress,2008: 934-938.
[2]Issa J, Ramaji. Product -Oriented Information DeliveryFramework for Multistory Modular Building Projects [J]. Journal ofComputing in Civil Engineering, 2017:04017001.
[3]Issa J. Ramaji,Ali M. Memari. Information ExchangeStandardization for BIM Application to Multi -Story ModularResidential Buildings [J]. American Society of Civil Engineers,2015: 78-93.
[4]Faraj I, Alshawi M, Aouad G, et al. An industry foundationclasses Web-based collaborative construction computer environment[J]. Automation in Construction, 2000, 10(1): 79-99.
[5]Vanlande R, Nicolle C. Ifc and building lifecyclemanagement[J]. Automation in Construction, 2009, 18(1):70-78.
[6]Kang Y , O Brien W J , O Connor J T . Analysis ofinformation integration benefit drivers and implementationhindrances[J]. Automation in Construction, 2012: 277-289.
[7]Hameri AP, Nitter P. Engineeringdata management throughdifferentbreakdown structures in a large -scale project [J].International JournalofProjectManagement,2002,(20):375-384.
[8]Wu I C, Hsieh S H. A framework for facilitating multi -dimensional information integration, management and visualizationin engineering projects [J]. Automation in Construction, 2012, 23(none):71-86.
[9]Viljamaa E, PeltomaaI.Intensified construction processcontrol using information integration[J]. Automation in Construction,2014, 39(4):126-133.
[10]Hyunjoo Kim,Kyle Anderson. Generating constructionschedules through automatic data extraction using open BIMtechnology[J].Automation in Construction,2013,35:285-295.
[11]Miroslaw J. Skibniewski, Tsung Wei Hung. Effects ofBuilding Information Modeling During Construction [J]. Journal ofApplied Science and Engineering,2014,2:157-166.
[12]Dennis R. A review of building information modeling andthe internet of things (IoT) devices ntegration: Present status andfuture trends [J]. Automation in Construction,2019,101:127-139.
[13]Peter Demian,David Walters. The advantages ofinformation management through building information modelling[J].Construction Management and Economics,2013: 37-41.
[14]Burcin Becerik -Gerber. The perceived value of buildinginformation modeling in the US building industry [J]. Journal ofInformation Technology in Construction,2010.
[15]劉占省,劉詩楠,王文思,趙玉紅,于嘉琪.基于低功耗廣域物聯網的裝配式建筑施工過程信息化解決方案[J].施工技術,2018,47(16):117-122.
[16]王威.基于 BIM 和物聯網技術的裝配式構件協同管理方法研究[D].廣東工業大學,2018.
[17]劉美霞,鄧曉紅,劉佳,徐秀杰,王全良,張中,王廣明.基于物聯網技術的裝配式建筑質量追溯系統研究 [J]. 住宅產業,2016(10):41-47.
[18]邱芬,彭小華,李萍.裝配式建筑質量檢測信息采集仿真研究[J].計算機仿真,2018,35(09):431-434.
[19]張楠.基于移動終端的工程質量安全信息采集系統開發及應用[J].施工技術,2016,45(18):29-32.
[20]賴華輝,鄧雪原,劉西拉.基于 IFC 標準的 BIM 數據共享與交換[J].土木工程學報,2018,51(04):121-128.
[21]鐘煒,姜騰騰.基于 BIM 的建筑工程項目多利益方協同機制框架研究[J].土木建筑工程信息技術,2014,6(05):95-101.
[22]張洋.基于 BIM 的建筑工程信息集成與管理研究[D].清華大學,2009.
[23]張德海,韓進宇,趙海南.BIM 環境下如何實現高效的建筑協同設計[J].土木建筑工程信息技術,2013,5(06):43-47.
[24]顏勤,宋曉宇“. Mars+VR”—提升建筑設計信息傳遞效率的新工具[J].建筑技藝,2018(11):117-119.
[25]王巧雯,張加萬.基于建筑信息模型的建筑多專業協同設計流程分析[J].同濟大學學報(自然科學版),2018,46(08):1155-1160.
[26]龍晴,沈良峰,張志東.裝配式住宅施工階段 WBS 應用研究[J].施工技術,2017,46(16):47-52.
[27]任志濤,郭林林,郝文靜.基與 BIM 的裝配式建筑項目集成管理模型研究[J].建筑經濟,2018,39(09):27-30.
[28]陳勇強,孫春風.大型工程建設項目信息集成管理研究[J].石油工程建設,2007(03):57-60,9.
[29]張健,陶豐燁.基于 BIM 技術的裝配式建筑集成體系研究[J].建筑科學,2018,34(01):97-102.